# Overtime (OT)

---

##### **How is OT displayed?**

A timesheet containing OT can be identified only on the Item Detail view. A column titled "OT" will appear, with the number of OT hours listed for each line with OT.

[![3La8.png](https://help.issny.org/uploads/images/gallery/2020-11/scaled-1680-/3La8.png)](https://help.issny.org/uploads/images/gallery/2020-11/3La8.png)

##### **How does OT affect the budget?**

OT affects the budget just like any other line on a timesheet.

##### **How is OT calculated?**

OT hours are paid at time and a half, plus fringe. The formula below shows how the cost for a line with OT is calculated, along with an example using the numbers above.

**Cost = \[ (Regular Hours)(Rate)(1 + Fringe Rate) \] + \[ (OT Hours)(1.5)(Rate)(1 + Fringe Rate) \]**   
**Cost = \[ (0.75)(23.00)(1 + 24%) \] + \[ (1.00)(1.5)(23.00)(1 + 24%) \]**   
**Cost = \[ (0.75)(23.00)(1 + 0.24) \] + \[ (1.00)(1.5)(23.00)(1 + 0.24) \]**   
**Cost = \[ (17.25)(1.24) \] + \[ (34.50)(1.24) \]**   
**Cost = (21.39) + (42.78)**   
**Cost = 64.17**